DISGUSTING! But the claw-foot tub was under there.
Basically me and my brother stripped the wallpaper and threw the toilet, vanity and everything surrounding the tub. Took apart the tub and slid it out (few hundred pounds). We replaced the floor with tile, put in a new vanity and toilet, put the tub back in and there you go, a functional bathroom. Renovation of this bathroom number #1
After:
Nothing fancy but MUCH improved.
Next to strip the floors with LOTS of scraping the floors and painting all the paneling fun colors to make do with what was. The wood 1970s paneling couldn't be removed without removing all the plaster walls behind them so for the time being make the best of it!
My living room for a time.
This was pretty much it for the work to do on the 2nd floor. It was basically TONS of paint to make it livable .
No comments:
Post a Comment